Below is some of our experience as engineers under different companies:
RICOH
10,000 square feet   - Class 10K & Class 100K
CD Manufacturing
Tustin, California
ProjectIO Vision
1,000 square feet - Class 1K, Class 10K & Class 100K
Contac Lens Manufacturing
Irvine, California
ProjectDerlan
2,000 square feet - Class 1K, Class 10K & Class 100K
Semi-Conductor Manufacturing
Tustin, California
ProjectSpeed Fam
8,000 square feet - Class 10, Class 100, Class 1K, Class 10K & Class 100K
Semi-Conductor Manufacturing
Phoenix, Arizona
ProjectRaytheon
2,000 square feet - Class 100, Class 1K, Class 10K & Class 100K
Semi-Conductor Manufacturing
Santa Barbara, California
ProjectNorthrop
1,000 square feet - Class 10K & Class 100K
Aerospace Manufacturing
El Segundo, California
ProjectBoeing
4,000 square feet - Class 10K & Class 100K
Aerospace Manufacturing
Long Beach, California
ProjectAllergan Pharmaceutical
5,000 square feet - Class 100, Class 1K, Class 10K & Class 100K
Aseptic Filling & Compounding Rooms
Sao Paulo, Brazil
ProjectAllergan Pharmaceutical
1,800 square feet
Bio-Safety Level-3 (Botox BL-3 Lab)
Irvine, California
ProjectWatson Labs
100,000 square feet - Class 100K
Capsules/Pills Filling Rooms
Irvine, California
ProjectGeorge Fischer
1,000 square feet - Class 10K & Class 100K
Valve &Process piping Manufacturing
Irvine, California

ProjectBaxter - Pharmaceutical
1,000 square feet - Class 1K, Class 10K & Class 100K
Valve &Process piping Manufacturing
Irvine, California

 

Below is some of our experience as engineers under R M D since 2004:
Project Allergan Pharmaceutical
10,000 square feet - Class 100, Class 1K, Class 10K & Class 100K
Aseptic Filling & Compounding Rooms
Irvine, California
ProjectAllergan Pharmaceutical
30,000 square feet
RD-1 Research & Developing Laboratories
Irvine, California
ProjectAllergan Pharmaceutical
100,000 square feet
Von Karman Building
Research, Developing and Manufacturing of Laboratories
Irvine, California
ProjectAllergan Pharmaceutical
Von Karman & Teller Building
Powder 25% relative humidity rooms, total of six room’s average of 400 square feet each.
Irvine, California
ProjectAllergan Pharmaceutical
Existing 6000 Ton Central Utility Plant which includes primary and secondary chilled water pumps replacements and piping configuration improvements.
Irvine, California
ProjectAllergan Pharmaceutical
RD-2 & RD-3 Miscellaneous lab renovations containing several biological safety cabinets, isotope and chemical fume hoods.
Irvine, California

ProjectAllergan Pharmaceutical
6200 Ton central utility plant chilled water primary and secondary loop remodel.
2500 Ton cooling towers remodel.
56 MBH heating hot water systems for five buildings. System comprises of gas group of eight roof gas boilers, primary/secondary water loops, pumps, chemical treatment.
Irvine, California

Copyright © 2007 RMD Engineers.
About us    |    Portifolio    |    Services    |    Careers    |    Contact us    |    Privacy policy